Kathy Leung
   

 

 

 

 

 


 Cremation system    
 Kwai Chung Crematorium
 Fu Shan Crematorium
 Diamond Hill Crematorium

All cremators of the above said crematoria is provided and installed by IFZW, a German company which specializes in construction, distribution and assembly of environmental incinerators since early 1930s.

 Diagram below shows the cremation and the cleaning of waste gas process

  Source: IFZW

The basic component of cremation system includes the Insertion Equipment, the Main Combustion Chamber, the Secondary Combustion Chamber, the Mineralization Chamber, the Rotary Valve System, and the Ashes Removal.

 

1

Coffin

9

Cooling Chamber

17

Heat Exchanger

2

Coffin Conveyor

10

Cooling Chamber Rotary Plate

18

Cyclone Separator

3

Main Chamber

11

Ashes Container

19

Reactor

4

Secondary Chamber

12

Stack

20

Flat Bag Filter

5

Furnace Door

13

Primary Burner

21

Flue Gas Exhaust Duct

6

Main Chamber Rotary Plate

14

Secondary Burner

22

Chimney

7

Mineralization Chamber

15

Mineralization Burner

23

Chemical Waste Barrel

8

Mineralization Chamber Rotary Plate

16

Flue Gas Duct

24

Periscope

All cremators are "Free-fall" type.

The coffin [1] is placed in front of the cremator on the coffin conveyor [2], while the average temperatures of the main chamber [3] and the secondary chamber [4] attained 650C and 850C respectively 10 minutes before the coffin insertion, controller will open the furnace door [5] and the cremation process will then be started.  The coffin will stay in the main chamber for not less than 55 minutes; controller will then open the furnace door again to inspect whether the primary cremation is satisfactory.  According to controller judgment, ashes will then be rotated to the mineralization chamber [7] through the main chamber rotary plate [6] (so-called: #1 rotary plate).  After next 30 minimum minutes of mineralization, ashes will then be rotated to the cooling chamber [9] for cooling down through the mineralization chamber rotary plate [8] (so-called: #2 rotary plate).  Ashes after cooling will then be rotated to the ashes container [11] for collection and pulverization through the cooling chamber rotary plate [10] (so-called: #3 rotary plate).

... (to be cont.)